久热国产精品-久热国产视频-久热精品视频在-久热精品视频在线电影-久热精品在线-久热这里只有精品7

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16579

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 欧美日韩国产精品专 | 不卡一区二区三区在线视频 | 99热在线免费 | 欧美日韩国产区在线观看 | 日韩视频专区 | 91色在线观看 | 一级特黄aaa大片 | 欧美激情一区二区三区在线 | 天天影视色香欲综合网老头 | 最新日本免 | 91精品啪在线观看国产18 | 成人做爰69试在线播放 | 国产又粗又黄又爽又硬一区二区 | 欧美一区二区激情视频 | 亚洲一区二区三区精品视频 | 加勒比女海盗3成版人在 | 日本丰满妇人成熟免费中文字幕 | 人人爱人人91 | 国产精品一区二区在线观看 | 91精品夜夜夜一区二区 | 免费看男女做爰爽爽 | 中日韩精彩视频一区二区 | 成人欧美日韩视频一区 | 97视频在线伦 | 国产精品1区2区3区 国产精品1 | 91午夜影院 | 99国产哺乳期美女挤奶 | 久热91| 蜜桃二区| 国产 欧美 日韩 综合 | 日韩一区二区三区精品 | 欧美 日韩 中文 制服 | 三级a级一级大片在线观看 午夜国产在线 | 国产又黄又粗又色又刺激视频 | 人人影视网 | 中国三级婬片免费播放 | 日韩精品中文字幕在线观看 | 五月天亭亭国色天香视频网 | 2025亚洲中文字幕 | 国产精品V | 91精品国产福利在线导航 |