久热国产精品-久热国产视频-久热精品视频在-久热精品视频在线电影-久热精品在线-久热这里只有精品7

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16586

Prev Next
×
主站蜘蛛池模板: 色系视频中文在线 | 亚洲精品国产va在线观看天堂 | 成人 涩涩小片视频 | 国产精品秀秀视频 | 91性视频 | 福利区在线观看 | 宅男色影视亚洲人在线 | 国产5p在线在 | 91卫星地图手机版app | 99在线精品视频 | 日本高清色本免费现在观看 | 国产丰满大乳奶水在线播放 | 国产91精品秘 入口福利 | 国产精品午夜在线观看体验区 | 日本乱伦视频网站 | 精品视频一区二区三区 | 91大神| 日韩一区二区免费 | 亚洲国产精品国自产拍a∨ 777午夜电影 | 欧美在线观看视频免费 | 国产日韩一区二区不卡视 | 午夜刺激黄瓜西瓜葡萄榴莲漫 | 青青国产在线观看 | 熟女乱伦片 | 最新影片上线 | 色天使色护士 | 日韩精品一区二区三区中 | 亚洲阿v网 | 亚洲欧美顶级欧 | 真人做爰片免费观看播放 | 国产精品自拍一区黑料网 | 另类TS人妖一区二区三区 | 三ji片在线观看大全免费观看 | 天堂成人资源 | 最新中文字幕在线视频 | 亚成人二区 | 成人午夜污污在线观看网站 | 欧美一卡二三卡四卡不卡 | 99视频在线精品国自产拍亚瑟 | 国产午夜在线视频 | 国产乱子伦免费观看视频 |