Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 国产高清 精品丝瓜 | 日本高清中文字幕一区二区三区 | 九九热精品 | 91看电视直播 | 牛牛影视一区二区三区免费看 | 国产又黄又粗又硬 | 中文字幕丰 | 日韩一区二区在线免费观看 | 国产综合精品中文字幕免费 | www.不卡亚洲伦理 | 91桃色2 | 国产日韩精品片 | 日本免费观看视频伦 | 欧美丰满一区二区免费视频 | 日韩一区欧美激情 | 日本一区二区三区视频在线 | 996热re视频精品视频这里 | 日本丝袜美腿中文字幕 | 91免费自拍 | 三级www…Pmcc| 欧美xxxxx精 欧美国产精品 | 区一区二区三区 | 日本迷奷系列在线播放97 | 国产三 做暧免费观看 | 97在线观看永久免费视频 | 亚洲电影一曲二曲三 | 手机看片欧美 | 2025手机偷拍精品视频 | 日本A级c片免费看三区 | 亚洲成国产人片在线观看 | 91精品国产综合蜜臀九色 | 深夜小福利| 最新中文字幕在线视频 | 亚洲精品免费视频 | 亚洲人交配视频 | 亚洲一区二区三区乱码视频 | 日本免费一区二区三区日本 | 国产一区国产二区国产三区国产欧美 | 成人国产在线不卡视频 | 色狠狠一区二区三区香蕉 | 最新国产欧美激情在线观看 |